Extension of the Frito Lay production plant in Tomaszów Mazowiecki

Enlarging the production area of the factory by adding to the existing building of a production and storage hall with installations and land development.

Client: Frito Lay Poland Sp. z o.o.
Area: 2800 m2
Location: Tomaszów Mazowiecki
Term: August 2010 - March 2011

We realised the extension of the production plant for the producer of salt snacks consisted in:

  • the addition of an single-storey production and warehouse building to the existing facility with numerous installations, including ventilation, air conditioning, electrical installation,
  • sprinkler system made in the FM Global system.
  • In addition, a fire route and a fire ring were completed, also with acceptance by the FM Global insurer.

Ta strona używa ciasteczek (cookies), dzięki którym nasz serwis może działać lepiej. Dowiedz się więcej. Rozumiem